Join Us for a Virtual Public Information Meeting on the Acceler-8 I-90 Bridge Replacements Project Wed, April 28th at 6pm

By contributor,
massdotwebinar_4.png

The Massachusetts Department of Transportation (MassDOT) is replacing bridges on I-90 east and westbound over Flanders Road in Westborough and Parkerville Road, Cordaville Road and Woodland Road in Southborough. To minimize disruptions, MassDOT will use a rapid bridge replacement approach to replace eight bridges over eight weekends. This approach reduces the project duration from a potential of three years with traditional construction methods to just over one year. In advance of the eight weekends, preparatory work is being performed on I-90 and on the local streets. The existing abutments are being refaced at Woodland, Parkerville and Flanders Roads. New abutments are being constructed at Cordaville Road.

This public meeting will provide information about the replacement of the eight bridges (two bridges per local road) that will take place over eight weekends between June 2021 and August 2021 as well as an update on ongoing preparatory work that began in February 2021.

The meeting will be held online, via Zoom. To register, please click this link:
https://us02web.zoom.us/j/81601492171?pwd=UmljbmpQWSt2cm9UZ1ZyYUU1bTAzZz09

After registering, you will receive a confirmation email containing information about joining the meeting. Upon joining you will be prompted to share your first name, last name and email address. Meeting attendees will be entered into the project’s email database to receive project updates. The meeting will be recorded and posted online for those who cannot attend. The presentation will be posted on the website the day before the meeting to allow people who plan to attend by phone the opportunity to review it prior to the meeting.

Public involvement and outreach

MassDOT will send e-blast and social media updates two weeks in advance of future construction phases and traffic shifts, and the website will be kept up to date. To receive email updates and meeting notices, please sign up for our email list.